Terms and Conditions

1. Definitions

1.1 “Contract” means the terms and conditions contained herein, together with any quotation, order, invoice or other document or amendments expressed to be supplemental to this Contract.
1.2 “Contractor” means Synergy Construction Group Pty Ltd, its successors and assigns or any person acting on behalf of and with the authority of Synergy Construction Group Pty Ltd.
1.3 “Client” means the person/s, entities or any person acting on behalf of and with the authority of the Client requesting the Contractor to provide the Works as specified in any proposal, quotation, order, invoice or other documentation, and:
(a) if there is more than one Client, is a reference to each Client jointly and severally; and
(b) if the Client is a partnership, it shall bind each partner jointly and severally; and
(c) if the Client is a part of a Trust, shall be bound in their capacity as a trustee; and
(d) includes the Client’s executors, administrators, successors and permitted assigns.
1.4 “Consultant” shall mean any person or persons engaged by the Contractor to provide specialised works on behalf of the Client.
1.5 “Works” means all Works (including consultation, manufacturing and/or installation services) or Materials supplied by the Contractor to the Client at the Client’s request from time to time (where the context so permits the terms ‘Works’ or ‘Materials’ shall be interchangeable for the other).
1.6 “Worksite” means the address nominated by the Client to which the Materials are to be supplied by the Contractor.
1.7 “Intended Use” means a building product and the use thereof, for which the building product is intended to be, or is reasonably likely to be, associated with a building.
1.8 “Non-Conforming Building Product” means building products that are regarded as Non-Conforming for an Intended Use if, when associated with a building:
(a) the product is not, or will not be, safe; or
(b) does not, or will not, comply with the relevant regulatory provisions; or
(c) the product does not perform, or is not capable of performing, for the use to the standard it is represented to conform by or for a person in the chain of responsibility for the product.
1.9 “Confidential Information” means information of a confidential nature whether oral, written or in electronic form including, but not limited to, this Contract, either party’s intellectual property, operational information, know-how, trade secrets, financial and commercial affairs, contracts, client information (including but not limited to, “Personal Information” such as: name, address, D.O.B, occupation, driver’s license details, electronic contact (email, Facebook or Twitter details), medical insurance details or next of kin and other contact information (where applicable), previous credit applications, credit history) and pricing details.
1.10 “Cookies” means small files which are stored on a user’s computer. They are designed to hold a modest amount of data (including Personal Information) specific to a particular client and website, and can be accessed either by the web server or the client’s computer. If the Client does not wish to allow Cookies to operate in the background when using the Contractor’s website, then the Client shall have the right to enable / disable the Cookies first by selecting the option to enable / disable provided on the website, prior to making enquiries via the website.
1.11 “Price” means the Price payable (plus any GST where applicable) for the Works as agreed between the Contractor and the Client in accordance with clause 6 below.
1.12 “GST” means Goods and Services Tax as defined within the “A New Tax System (Goods and Services Tax) Act 1999” (Cth).

2. Acceptance

2.1 The Client is taken to have exclusively accepted and is immediately bound, jointly and severally, by these terms and conditions if the Client places an order for or accepts delivery of any Works.
2.2 In the event of any inconsistency between the terms and conditions of this Contract and any other prior document or schedule that the parties have entered into, the terms of this Contract shall prevail.
2.3 Any amendment to the terms and conditions contained in this Contract may only be amended in writing by the consent of both parties.
2.4 The Client acknowledges that the supply of Works on credit shall not take effect until the Client has completed a credit application with the Contractor and it has been approved with a credit limit established for the account.
2.5 In the event that the supply of Works requested exceeds the Client’s credit limit and/or the account exceeds the payment terms, the Contractor reserves the right to refuse delivery.
2.6 Where the Contractor gives any advice, recommendation, information, assistance or service provided by the Contractor in relation to Materials or Works supplied is given in good faith to the Client, or the Client’s agent and is based on the Contractor’s own knowledge and experience and shall be accepted without liability on the part of the Contractor. Where such advice or recommendations are not acted upon then the Contractor shall require the Client or their agent to authorise commencement of the Works in writing. The Contractor shall not be liable in any way whatsoever for any damages or losses that occur after any subsequent commencement of the Works.
2.7 In the event that the Client requests the Contractor to provide the Works urgently, that may require the Contractor’s staff to work outside normal business hours (including but not limited to working, through lunch breaks, weekends and/or Public Holidays) then the Contractor reserves the right to charge the Client additional labour costs (penalty rates will apply at time and a half normal rates), unless otherwise agreed between the Contractor and the Client.
2.8 Electronic signatures shall be deemed to be accepted by either party providing that the parties have complied with Section 9 of the Electronic Transactions Act 2000 or any other applicable provisions of that Act or any Regulations referred to in that Act.

3. Authorised Representatives

3.1 The Client acknowledges that the Contractor shall (for the duration of the Works) liaise directly with one (1) authorised representative, and that once introduced as such to the Contractor, that person shall have the full authority of the Client to order any Works and/or to request any variation thereto on the Client’s behalf. The Client accepts that they will be solely liable to the Contractor for all additional costs incurred by the Contractor (including the Contractor’s profit margin) in providing any Works or variation/s requested thereto by the Client’s duly authorised representative.

4. Errors and Omissions

4.1 The Client acknowledges and accepts that the Contractor shall, without prejudice, accept no liability in respect of any alleged or actual error(s) and/or omission(s):
(a) resulting from an inadvertent mistake made by the Contractor in the formation and/or administration of this Contract; and/or
(b) contained in/omitted from any literature (hard copy and/or electronic) supplied by the Contractor in respect of the Works.
4.2 In the event such an error and/or omission occurs in accordance with clause 4.1, and is not attributable to the negligence and/or wilful misconduct of the Contractor; the Client shall not be entitled to treat this Contract as repudiated nor render it invalid.

5. Change in Control

5.1 The Client shall give the Contractor not less than fourteen (14) days prior written notice of any proposed change of ownership of the Client and/or any other change in the Client’s details (including but not limited to, changes in the Client’s name, address, contact phone or fax number/s, change of trustees, or business practice). The Client shall be liable for any loss incurred by the Contractor as a result of the Client’s failure to comply with this clause.

6. Price and Payment

6.1 At the Contractor’s sole discretion the Price shall be either:
(a) as indicated on invoices provided by the Contractor to the Client in respect of Works performed or Materials supplied; or
(b) the Contractor’s quoted Price (subject to clause 6.2) which shall be binding upon the Contractor provided that the Client shall accept the Contractor’s quotation in writing within thirty (30) days.
6.2 The Contractor reserves the right to change the Price:
(a) if a variation to the Materials which are to be supplied is requested; or
(b) if a variation to the Works originally scheduled (including any applicable plans or specifications) is requested; or
(c) where additional Works are required due to the discovery of hidden or unidentifiable difficulties (including, but not limited to, poor weather, limitations to accessing the Worksite, obscured building/Worksite defects, incorrect measurements, plans and/or specifications provided by the Client, safety considerations (discovery of asbestos, etc.), additional excavation works required, prerequisite work by any third party not being completed, lack of required utilities, remedial work required due to existing workmanship being of a poor quality or non-compliant to the building code, hard rock barriers below the surface, iron reinforcing rods in concrete or hidden pipes, moisture and wiring in walls, etc.) which are only discovered on commencement of the Works; or
(d) in the event of increases to the Contractor in the cost of labour or Materials which are beyond the Contractor’s control.
6.3 Variations will be charged for on the basis of the Contractor’s quotation, and will be detailed in writing, and shown as variations on the Contractor’s invoice. The Client shall be required to respond to any variation submitted by the Contractor within ten (10) working days. Failure to do so will entitle the Contractor to add the cost of the variation to the Price. Payment for all variations must be made in full at the time of their completion.
6.4 At the Contractor’s sole discretion a non-refundable deposit may be required.
6.5 Time for payment for the Works being of the essence, the Price will be payable by the Client on the date/s determined by the Contractor, which may be:
(a) on completion of the Works; or
(b) by way of progress payments in accordance with the Contractor’s specified progress payment schedule. Such progress payment claims may include the reasonable value of authorised variations and the value of any Materials delivered to the Worksite but not yet installed; or
(c) the date which shall either be fourteen (14) or thirty (30) days following the date of any invoice given to the Client by the Contractor; or
(d) failing any notice to the contrary, the date which is seven (7) days following the date of any invoice given to the Client by the Contractor.
6.6 Payment may be made by electronic/on-line banking, or by any other method as agreed to between the Client and the Contractor.
6.7 The Contractor may in its discretion allocate any payment received from the Client towards any invoice that the Contractor determines and may do so at the time of receipt or at any time afterwards. On any default by the Client the Contractor may re-allocate any payments previously received and allocated. In the absence of any payment allocation by the Contractor, payment will be deemed to be allocated in such manner as preserves the maximum value of the Contractor’s Purchase Money Security Interest (as defined in the PPSA) in the Materials.
6.8 The Client shall not be entitled to set off against, or deduct from the Price, any sums owed or claimed to be owed to the Client by the Contractor nor to withhold payment of any invoice because part of that invoice is in dispute.
6.9 Unless otherwise stated the Price does not include GST. In addition to the Price, the Client must pay to the Contractor an amount equal to any GST the Contractor must pay for any supply by the Contractor under this or any other contract for the sale of the Materials. The Client must pay GST, without deduction or set off of any other amounts, at the same time and on the same basis as the Client pays the Price. In addition, the Client must pay any other taxes and duties that may be applicable in addition to the Price except where they are expressly included in the Price.

7. Nominated Consultants

7.1 The Contractor shall engage Consultants as specified in the quotation acting solely as agent on behalf of the Client and the following shall apply:
(a) the Contractor shall be entitled to enter into contracts with such Consultants in the name of the Client;
(b) the Client shall be responsible for all payments to such Consultants;
(c) where the Contractor pays the Consultant’s account on behalf of the Client, the Client shall reimburse the Contractor for the payment of the Consultant’s account together with an account-handling Price within seven (7) days from the date of submission of the account by the Contractor to the Client;
(d) if the Client does not reimburse the Contractor within seven (7) days from the date of submission of the account in accordance with subparagraph (c) above, the Contractor shall be entitled to;
(e) charge interest at the rate specified in clause 21.1 from the date of payment of the Consultant’s account by the Contractor to the date of reimbursement to the Contractor by the Client; and/or
(f) an administration Price per month as stated in clause 21.2 on any outstanding monies due to the Contractor.
7.2 The Contractor does not warrant the accuracy or quality of the Consultant’s work or warrant that the recommendations of the Consultant are appropriate or adequate or are fit for their purpose or that they are not given negligently. The Client agrees that they shall not make any demand on the Contractor or commence any legal proceedings against the Contractor and the Contractor shall have no liability, whether in negligence or otherwise, to the Client in relation to any work performed by the Consultant.

8. Provision of the Works

8.1 Subject to clause 8.2 it is the Contractor’s responsibility to ensure that the Works start as soon as it is reasonably possible.
8.2 The Works’ commencement date will be put back and/or the completion date extended by whatever time is reasonable in the event that the Contractor claims an extension of time (by giving the Client written notice) where completion is delayed by an event beyond the Contractor’s control, including but not limited to:
(a) approval authority’s response times for requests for preliminary decisions/information; or
(b) information from Consultants, councils or referral agencies not being available when required; or
(c) changes to the design brief being requested by the Client; or
(d) time taken by the approval authority for the granting of required approvals; or
(e) any other variation to the Contract; and
(f) any failure by the Client to:
(i) make a selection; or
(ii) supply response(s) to information request(s) made by the Contractor when required; or
(iii) have the Worksite ready for the Works; or
(iv) notify the Contractor that the Worksite is ready.
8.3 At the Contractor’s sole discretion, the cost of delivery is in addition to the Price.
8.4 The Contractor may deliver the Works by separate instalments. Each separate instalment shall be invoiced and paid in accordance with the provisions in these terms and conditions.
8.5 Any time specified by the Contractor for delivery of the Works is an estimate only and the Contractor will not be liable for any loss or damage incurred by the Client as a result of delivery being late. However, both parties agree that they shall make every endeavour to enable the Works to be supplied at the time and place as was arranged between both parties. In the event that the Contractor is unable to supply the Works as agreed solely due to any action or inaction of the Client, then the Contractor shall be entitled to charge a reasonable fee for re-supplying the Works at a later time and date, and/or for storage of the Materials.

9. Risk

9.1 If the Contractor retains ownership of the Materials under clause 16 then:
(a) where the Contractor is supplying Materials only, all risk for the Materials shall immediately pass to the Client on delivery and the Client must insure the Materials on or before delivery. Delivery of the Materials shall be deemed to have taken place immediately at the time that either:
(i) the Client or the Client’s nominated carrier takes possession of the Materials at the Contractor’s address; or
(ii) the Materials are delivered by the Contractor or the Contractor’s nominated carrier to the Client’s nominated delivery address (even if the Client is not present at the address).
(b) where the Contractor is to both supply and install Materials then the Contractor shall maintain a contract works insurance policy until the Works are completed. Upon completion of the Works all risk for the Works shall immediately pass to the Client.
9.2 Notwithstanding the provisions of clause 9.1 if the Client specifically requests the Contractor to leave Materials outside the Contractor’s premises for collection or to deliver the Materials to an unattended location then such materials shall always be left at sole risk of the Client and it shall be the Client’s responsibility to ensure the Materials are insured adequately or at all. In the event that such Materials are lost, damaged or destroyed then replacement of the Materials shall be at the Client’s expense.
9.3 The Contractor shall be entitled to rely on the accuracy of any plans, specifications and other information provided by the Client. The Client acknowledges and agrees that in the event that any of this information provided by the Client is inaccurate, the Contractor accepts no responsibility for any loss, damages, or costs however resulting from these inaccurate plans, specifications or other information.
9.4 Where the Client has provided instructions or specifications for the Contractor to complete the Works (including, but not limited to, any requested variation to the original design), then the Contractor shall accept no liability whatsoever for the finished Works being deemed as unsatisfactory to the Client.
9.5 The Client warrants that any structures to which the Materials are to be affixed are able to withstand the installation of the Materials once installed. If for any reason that the Contractor, or employees of the Contractor, reasonably form the opinion that the Client’s premises is not safe for the installation of Materials to proceed then the Contractor shall be entitled to delay installation of the Materials (in accordance with the provisions of clause 8.2 above) until the Contractor is satisfied that it is safe for the installation to proceed.
9.6 Where applicable to the specific Materials and/or Works provided to the Client, the Client acknowledges and accepts that Materials supplied may exhibit variations in shade, colour, texture, surface, finish, markings and may contain natural fissures, occlusions, lines, indentations which may vary between batches of product and/or between sales samples or actual products supplied and may:
(a) fade or change colour over time;
(b) expand, contract or distort as a result of exposure to extreme temperatures and weather conditions;
(c) mark or stain if exposed to certain substances; and
(d) be damaged or disfigured by impact or scratching.
Concreting Risk
9.7 Where the Contractor gives advice or recommendations to the Client, or the Client’s agent, regarding the suitability of the Worksite for the laying of concrete slabs, foundations or similar works and such advice or recommendations are not acted upon then the Contractor shall require the Client or their agent to authorise commencement of the Works in writing. The Contractor shall not be liable in any way whatsoever for any damages or losses that occur after any subsequent commencement of the Works.
9.8 Detailed drawings of any services that will be embedded in the concrete are to be provided to the Contractor prior to commencement of any Works. Whilst all due care will be taken no liability will be accepted by the Contractor for damage to the services or any other element embedded in the concrete.
9.9 The Contractor gives no guarantee (expressed or implied) as to the length of time the curing process will take and/or against cracking of concrete that may occur naturally in the works such as:
(a) hairline cracking of paving and grout; or
(b) damage caused by contact with chemicals, solvents, oils or any other substances; or
(c) the affects by elements such as heat exposure or wet weather conditions that prolong the curing process.
9.10 The Contractor shall not be liable for any defect in the Works if the Client does not follow the Contractor’s recommendations, including:
(a) to water the concrete periodically to limit the risk of possible cracking due to weather conditions;
(b) that no foot traffic and/or any vehicles on the concrete for a minimum of forty-eight (48) hours but preferably seven (7) days; and
(c) that no heavy furniture is to be placed on the concrete area for a minimum of forty-eight (48) hours.
9.11 The Client acknowledges and agrees that it is their responsibility to organise and be liable for all costs associated with protecting the concrete and shall take all reasonable precautions to protect against destruction or damage by way of vandalism. In the event that the concrete is destroyed or damaged due to vandalism then the cost of repair or replacement shall be borne by the Client.
Fencing Risk
9.12 The Client must be on the Worksite to supervise the marking out of the fence line, placement of boundary pegs and during the installation of the fence. If the Client fails to comply with this clause then the Contractor accepts no responsibility for installation decisions that need to be made by the Contractor in the Client’s absence.
9.13 The Client acknowledges that it is their responsibility to remove any existing fence (including existing footings), trees, vines and shrubs to allow the Contractor clear access along the proposed fence line prior to commencement of the Works by the Contractor unless otherwise agreed in writing between the Contractor and the Client. Under no circumstances will the Contractor handle removal of asbestos product.
9.14 Whilst the Contractor will take all due care during installation the Contractor will not accept any responsibility for tiles or pavers damaged during installation.
9.15 Where fencing is installed on a retaining wall the Contractor shall not be liable for any movement in the fence due to consolidation or the movement of soil or any other component of the retaining wall.
9.16 The Contractor shall not be responsible for digging land out under fence lines nor removal of soil from the Worksite.
9.17 The Contractor reserves the right to touch-up all products supplied and installed on the Worksite.
Electrical Risk
9.18 In the event that the electrical wiring is required to be re-positioned at the request of any third party contracted by the Client then the Client agrees to notify the Contractor immediately upon any proposed changes. The Client agrees to indemnify the Contractor against any additional costs incurred with such a relocation of electrical wiring. All such variances shall be invoiced in accordance with clause 6.2.
9.19 The Client acknowledges and accepts that:
(a) the Contractor shall not be responsible or liable for any defect in other appliances or power points as a coincidence of the Contractor installing the Materials, and
(b) any defects in the Materials or appearing in the Works after completion due to the Client or any third party using any items that overloads the structure or system to which the Contractor’s Materials are installed or connected to, or by workmanship not performed by the Contractor, shall not be covered by any applicable warranty pertaining to the Materials.
Air Conditioning Risk
9.20 Whilst the final location of the condensing unit is at the discretion of the Client, a charge will apply as a variation as per clause 6.2, if the Client requests the unit to not be located adjacent to the external wall, due to the underground piping required.
9.21 The final location of the wall, window or floor unit must be determined on the Worksite by the Client.
9.22 The Client acknowledges and agrees that:
(a) the Contractor does not guarantee any noise levels (external or internal) and the Contractor shall not be held liable for any loss, damages, or costs, however resulting from noise levels; and
(b) it is their responsibility to insure any equipment partly or completely installed on the Worksite, against theft or damage.
9.23 In the event that:
(a) any of the equipment needs to be relocated due to complaints from neighbours or local authorities, then the Client shall be responsible for any and all costs involved; and
(b) the electrical wiring is required to be re-positioned at the request of any third party contracted by the Client then the Client agrees to notify the Contractor immediately upon any proposed changes. The Client agrees to indemnify the Contractor against any additional costs incurred with such a relocation of electrical wiring. All such variances shall be invoiced in accordance with clause 6.2.
Plumbing Risk
9.24 The Client acknowledges and accepts that choked drains generally indicate pipelines are not fully efficient (i.e. breakages, cracks, negative fall or tree root entry); the drain line cannot be repaired or rectified just by clearing it on its own. Once cleared, the Contractor cannot give any guarantee against reoccurrence or further damage. In the event that the Client requests the Contractor to use drain/pipe unblocking equipment (including but not limited to, CCTV camera or an electric eel), and the Contractor does not recommend the use of such equipment due to the risk of the equipment becoming lodged or stuck, the Contractor may require the Client or their agent to authorise commencement of the Works in writing. If the drain/pipe unblocking equipment subsequently becomes lodged or stuck, the Client shall be responsible for the cost of repair, replacement and/or retrieval of said equipment.
Roofing Risk
9.25 The Contractor’s quotation for repairs to existing roofs shall be based only on the replacement of damaged roofing/cladding and/or any other roofing materials and shall not include the replacement of roofing/cladding and/or any other roofing materials with slight imperfections unless authorised by the Client prior to the commencement of the Works. If the Client requests the replacement of roofing/cladding and/or any other roofing materials that have slight imperfections but the Contractor does not deem to be defective or affect the integrity of the roof then this shall be a variation to the original quotation and clause 6.2 will apply;
(a) no persons other than those authorised or employed by the Contractor are to walk on the treated roof surface for a period of twenty-one (21) days after completion of the job and at no time are any persons permitted to be in the areas of the Works. The Contractor shall not be liable for any loss, damages, injuries, or costs however arising resulting from the Client’s failure to comply with this clause; and
(b) the Contractor accepts no liability for any subsequent loss or damage (including, but not limited to, internal water damage) to the Client’s property which may occur during the cleaning process where such loss or damage is due to pre-existing faults or leaks; and
(c) that it is their responsibility to ensure that any uncompleted areas are kept watertight during construction if there is any delay in the Works due to circumstances beyond the control of the Contractor (including, but not limited to, waiting on another trade, materials, or weather conditions). The Contractor will accept no liability whatsoever for any damages caused as a result of the Client’s failure to comply with this clause.
Flooring Risk
9.26 The Contractor will not accept responsibility for any damage to the floor due to microenvironments caused by air-conditioning, heating or large expanses of glass windows without curtains or blinds.
9.27 Whilst the Contractor will take all due care to avoid contamination of the finished surface, the Contractor accepts no responsibility for contamination by natural contaminates such as dust or hair which may be present at the Worksite.
9.28 The Contractor will only inspect or view a timber floor from a standing position, as this is generally how you will be living on it. Minor marks or slight imperfections in the floor finish that can only be viewed from a crouching or kneeling position will not be considered defects.
Carpet Clauses
9.29 The Client acknowledges and accept that;
(a) whilst carpet manufacturers make every effort to match dye lots, colours or shade may vary between batches of product and/or between sales samples and actual product supplied;
(b) carpet manufacturers cannot guarantee to produce perfectly uniform patterned product, therefore there is no guarantee that patterned product will match perfectly when installed; and
(c) the installation process for carpet may require seams and cross-joins and that the appearance of these may be affected by light source and in particular the construction of the chosen product.
Timber Clauses
9.30 Timber is a:
(a) natural product and as such may exhibit variations in texture, shade, colour, surface, finish, markings, veining, and contain natural fissures, occlusions, and indentations. Whilst the Contractor will make every effort to match sales samples to the finished Materials the Contractor accepts no liability whatsoever where such samples differ to the finished Materials supplied; and
(b) hydroscopic material subject to expansion and contraction, therefore the Contractor will accept no responsibility for gaps that may appear in the flooring during prolonged dry periods.
Vinyl or Cork Tile Flooring Risk
9.31 The Client acknowledges and agrees that the Contractor shall not be liable for any loss, damages or costs however arising in the event that:
(a) a heavy or sharp object is dropped or falls on the vinyl, as vinyl will show scratches and will get cut as it is a soft and flexible Materials; or
(b) an object is dragged across it as vinyl can rip and tear; or
(c) the vinyl discolours or bubbles in areas due to exposure to extreme heat (including, but not limited to, conservatories and floor to ceiling windows).
9.32 The Contractor does not recommend vinyl to be installed over a floor that is a combination of wood and concrete, or expansion joints in concrete floors, as any movement, joint, seams in bison board, or thin line board will show through the vinyl.
9.33 The Client acknowledges and agrees that vinyl will not fully seal a floor around the edges particularly around showers or baths; the Client also agrees water can get underneath and therefore bubble and/or discolour the vinyl. The Contractor shall not be held liable for any loss, damages or costs however arising due to the same.
9.34 The Contractor shall advise the Client if the Contractor believes that there are any issues with the sub floor (including, but not limited to, moisture problems which may cause the vinyl to bubble and discolour) however the Client acknowledges that it is not always possible to identify such problems therefore the Client agrees that the Contractor shall not be held liable in any way whatsoever should any such issue go undetected causing damage to the Materials.
Tile Risk
9.35 The Contractor gives no guarantee (expressed or implied) against crazing, cracking, chipping or scratching that may occur that is beyond the Contractor’s control due to the nature of the product at the time of installation, therefore it is recommended that the Client allows for extra product for such breakages.
Painting Risk
9.36 The Client acknowledges and accepts that:
(a) the Contractor shall be indemnified for any claims made where colour fade occurs due to paint colours chosen by the Client that have less than a forty percent (40%) light-reflectance value (LRV) as these are inclined to fade more readily than those colours with a greater LRV;
(b) any faults with underlying surfaces or structures may affect the finish of the completed Works;
(c) where the Contractor has been requested to perform remedial work on damaged structures, evidence of repairs may be apparent after the completion of the Works; and
(d) acknowledges and agrees that whilst the Contractor shall take all reasonable care during the performance of the Works, the Client agrees that the Contractor shall not be held liable for any loss, damages, or costs howsoever resulting from drilling or fixing the Materials into any masonry or rendered surfaces during the installation process.
9.37 The Contractor offers no guarantee against the following defects or damage that may occur naturally in the Works over time:
(a) cracking of paint over plaster where the wrong paints are used for coating; or
(b) delaminating of the plaster caused by hydroscopic movement or dampness in the substrate; or
(c) damage caused by contact with chemicals, solvents, oils or any other substances; or
(d) the occurrence of efflorescence and any detrimental effects this has on the appearance of the Works; or
(e) peeling or flaking caused by the environment or other external factors.
9.38 The Contractor shall not be liable for:
(a) any pre-existing damages discovered by the Contractor prior to the commencement of the Works. The Client will be notified of any such discovery in writing; or
(b) inferior existing paintwork where the Contractor’s paint has bonded to the existing paintwork and weakened the previous paint causing any kind of flake, crack, blemish, blistering or delamination; or
(c) the quality of the Works if the Client does not follow the Contractor’s recommendations as to the number of coats of paint required to obtain the final finish if the Client chooses to accept a reduced Price based on fewer coats of paint; or
(d) any loss or damage to the Works (including, but not limited to, painted/plastered surfaces) that is caused by any other tradesmen during and after the completion of the Works.
Plastering Risk
9.39 The Client acknowledges and accepts that:
(a) any faults with underlying surfaces or structures may affect the finish of the completed Works;
(b) where the Contractor has been contracted to perform cosmetic repairs (e.g. repair surface cracking) on textured or plastered surfaces:
(i) the Contractor is in no way remedying or repairing any damage or moisture ingress that may have been resultant, or could result, from the cracking; and
(ii) such repairs are in no way a guarantee (express or implied) of water tightness, and must not be considered such by the Client.
(c) where the Contractor has been requested to repair existing and/or damaged structures or materials, evidence of repair will be evident after completion of the Works;
(d) if the Client wishes for the original surface to be repaired to a ‘before damage’ state, regibbing and plastering is required to achieve this, such additional Works will be in addition to the Price and invoiced as a variation in accordance with clause 6.2; and
(e) accepts where the Contractor has been requested to install a decorative application to a surface to imitate a natural product (including, but not limited to, stone, marble etc.), the Contractor does not warrant that such will perform like the product that it imitates as far as wearing, cleaning, rigidity and weight bearing capabilities.
9.40 The Contractor shall not be liable for any loss, costs or damages for any staining that may occur due to the nature of anodized joinery reacting with the plaster.

10. Clients Responsibilities

10.1 It shall be the Client’s responsibility (where applicable) to ensure that, prior to commencement of the Works:
(a) all gas and electricity are cancelled and disconnected (from the main supply at the street); and
(b) a safety fence is erected around the perimeter of the Worksite to ensure public safety.
10.2 It is the intention of the Contractor and agreed by the Client that it is the responsibility of the Client to provide and have erected scaffolding to enable the Works to be undertaken (where in the Contractor’s opinion it is deemed necessary). It is also agreed that all scaffolding erected will comply with industry safety standards and that any person erecting the scaffolding shall be suitably qualified to ensure its safe and proper erection and where necessary shall hold a current certificate of competency and/or be fully licensed.
10.3 The Client agrees to remove any furniture, furnishings or personal goods from the vicinity of the Works and agrees that the Contractor shall not be liable for any damage caused to those items through the Clients failure to comply with this clause.
10.4 Where the Contractor requires that Materials, tools etc. required for the Works be stored at the Worksite, the Client shall supply the Contractor a safe area for storage and shall take all reasonable efforts to protect all items from destruction, theft or damage. In the event that any of the stored items are destroyed, stolen or damaged, then the cost of repair or replacement shall be the Client’s responsibility.

11. Asbestos/Hazardous Materials

11.1 Prior to the Contractor commencing any Works the Client must advise the Contractor of the precise location of all known Asbestos/Hazardous Materials on the Worksite and clearly mark the same. Removal from the Worksite and the disposal of Asbestos/Hazardous Materials shall at all times be the Client’s responsibility unless otherwise agreed in writing.
11.2 In the event that the Contractor discovers Asbestos/Hazardous Materials whilst undertaking any Works the Contractor shall immediately advise the Client of the same and shall be entitled to suspend the Works pending a risk assessment in relation to those materials. The Client shall be liable for all additional costs (howsoever arising) incurred by the Contractor as a result of the discovery of Asbestos/Hazardous Materials and/or any suspension of Works in relation thereto.
11.3 Where the Contractor agrees to remove any Asbestos/Hazardous Materials on the Client’s behalf then the Client shall be liable for all costs incurred by the Contractor in the removal and disposal those materials.
11.4 Both the Client and the Contractor agree that they will at all times ensure that they comply with the provisions of all statutes, regulations and bylaws of government, local and other public authorities that may be applicable to the works, including work health and safety (WHS) laws relating to building/construction sites, and any other relevant safety standards or legislation, particularly those in relation to Asbestos/Hazardous Materials and the safe removal and disposal of the same.

12. Worksite Access and Condition

12.1 The Contractor is not responsible for the removal of rubbish from or clean-up of the building/construction Worksite/s. All rubbish generated by the Contractor will be placed in a designated area appointed by the Client but the responsibility of removal of same is the Client or the Client’s agent, unless otherwise agreed.
12.2 It is the intention of the Contractor and agreed by the Client that:
(a) the Client shall ensure that the Contractor has clear and free access to the Worksite at all times to enable them to undertake the Works (including carrying out Worksite inspections, gain signatures for required documents, and for the delivery and installation of the Materials). The Contractor shall not be liable for any loss or damage to the Worksite (including, without limitation, damage to pathways, driveways and concreted or paved or grassed areas) unless due to the negligence of the Contractor;
(b) it is the responsibility of the Client to ensure that access is suitable to accept the weight of laden trucks, front end loaders or other earth moving equipment as may be deemed necessary by the Contractor;
(c) it is the Client’s responsibility to provide the Contractor, while at the Worksite, with adequate access to available water, electricity, toilet and washing facilities; and
(d) the Client shall contact adjoining neighbours and gain their permission to remove any walls or fences on boundaries and unless otherwise agreed, it shall be the Client’s responsibility to organise either temporary fencing and/or security guards to secure the Worksite during the performance of the Works by the Contractor and shall be liable for all costs associated in taking all reasonable precautions to protect against destruction or damage by way of vandalism or theft. Failure to comply with this clause 12.2(d) in the event that the Worksite is destroyed or damaged due to vandalism then the cost of repair or replacement shall be borne by the Client.
12.3 The Client agrees to be present at the Worksite when and as reasonably requested by the Contractor and its employees, contractors and/or agents.
12.4 Worksite Inductions
(a) in the event the Client requires an employee or sub-contractor of the Contractor to undertake a Worksite induction during working hours, the Client will be liable to pay the hourly charges for that period. If any induction needs to be undertaken prior to the commencement date then the Client shall be liable to pay the Contractor’s standard (and/or overtime, if applicable) hourly labour rate; or
(b) where the Contractor is in control of the Worksite, the Client and/or the Client’s third party contractors must initially carry out the Contractor’s Health & Safety induction course before access to the Worksite will be granted. Inspection of the Worksite during the course of the Works will be by appointment only and unless otherwise agreed, in such an event the Client and/or third party acting on behalf of the Client must at all times be accompanied by the Contractor.

13. Underground Locations

13.1 Prior to the Contractor commencing any work the Client must advise the Contractor of the precise location of all underground services on the Worksite and clearly mark the same. The underground mains and services the Client must identify include, but are not limited to, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigation pipes, telephone cables, fibre optic cables, oil pumping mains, and any other services that may be on the Worksite.
13.2 Whilst the Contractor will take all care to avoid damage to any underground services the Client agrees to indemnify the Contractor in respect of all and any liability claims, loss, damage, costs and fines as a result of damage to services not precisely located and notified as per clause 13.1.

14. Insurance

14.1 The Contractor shall have public liability insurance of at least five million dollars ($5m). It is the Client’s responsibility to ensure that they are similarly insured.

15. Compliance with Laws

15.1 The Client and the Contractor shall comply with the provisions of all statutes, regulations and bylaws of government, local and other public authorities that may be applicable to the Works, including any work health and safety laws (WHS) relating or any other relevant safety standards or legislation pertaining to the Works.
15.2 Both parties acknowledge and agree:
(a) to comply with the National Construction Code of Australia (NCC) and the Building Products (Safety) Act 2017, in respect of all workmanship and building products to be supplied during the course of the Works; and
(b) that Works will be provided in accordance with any current relevant Australian/New Zealand Standards applicable.
15.3 Where the Client has supplied products for the Contractor to complete the Works, the Client acknowledges that it accepts responsibility for the suitability of purpose and use for their products and the Intended Use and any faults inherent in those products. However, if in the Contractor’s opinion, it is believed that the materials supplied are Non-Conforming products and will not conform with state and/or territory regulations, then the Contractor shall be entitled, without prejudice, to halt the Works until the appropriate conforming products are sourced and all costs associated with such a change to the plans and design will be invoiced in accordance with clause 6.2.
15.4 The Client shall obtain (at the expense of the Client) all licenses and approvals that may be required for the Works.
15.5 All work will be tested to ensure that it is electrically safe and is in accordance with the wiring rules and other standards applying to the electrical installation under the Electrical Safety Regulations. All of the cabling work will comply with all relevant Australian and New Zealand Wiring standards.
15.6 If during the course of installation when the Works are being conducted within and around switchboards that if the same is found defective or deemed to be unsafe by the Contractor, then the Contractor shall notify the Client immediately. The power if isolated will not be re-energised until such time as the existing condition has been rectified and made safe in accordance to the Electrical Safety Regulations. The Client accepts and agrees that any costs associated with the rectification Works including any Materials and labour shall be to the Client’s account.
15.7 Any live Works or Works undertaken near live conductors where it is safe to do so shall be dealt with in accordance with Australian and New Zealand Wiring standards being “Safe working on Low Voltage Electrical Installations, relevant Commonwealth and Statutory Acts and Work Place Regulations”. The Contractor’s live Works procedures are designed to eliminate risk of injury to the Contractor’s employees, damage to the Client’s installations and unexpected power disconnections. It may in some cases require disconnection and isolation of the installation to undertake such Works for which additional charges may be applicable. This shall be invoiced in accordance with clause 6.2.
15.8 Prior to commencement of any Works the Contractor shall carry a routine soundness test of the Worksite to ensure there are not any gas leaks in the existing pipework. In the event of such a discovery the Contractor where necessary will have the gas supply capped-off until the fault is found and repaired at the Client’s expense.
15.9 The Client acknowledges and accepts that in instances where the gas supply is turned off at the meter or bottles by the Contractor in order to carry out the soundness test that parts within a gas appliance may fail due to not being turned off and serviced for a long period of time including, thermocouples, blocked pilot tubes, and SIT valves on pilot assemblies. Any costs associated with such an event shall be borne by the Client.
15.10 The Client warrants that any existing plumbing, gasfitting and/or associated services in or upon the Worksite that is subject to the Materials and/or Works are in compliance with regulations. The Contractor reserves the right to halt all Works (in accordance with the provisions of clause 8.2 above) if in their opinion the Worksite is unsafe and/or the current positioning of the unit is illegal due to not meeting the required clearances then the Client will be informed of this and will be given a revised quotation or estimate to install the new appliance in a safe and legal position. Should the Client not wish to proceed the Contractor will charge a standard fee for the time spent on Worksite based on the Contractor’s quotation.
15.11 The Contractor shall comply with the terms and conditions of all such consents and approvals in so far as such consents and approvals relate to the carrying out of the Works.

16. Title

16.1 The Contractor and the Client agree that ownership of the Materials shall not pass until:
(a) the Client has paid the Contractor all amounts owing to the Contractor; and
(b) the Client has met all of its other obligations to the Contractor.
16.2 Receipt by the Contractor of any form of payment other than cash shall not be deemed to be payment until that form of payment has been honoured, cleared or recognised.
16.3 It is further agreed that until ownership of the Materials passes to the Client in accordance with clause 16.1:
(a) the Client is only a bailee of the Materials and unless the Materials have become fixtures must return the Materials to the Contractor on request;
(b) the Client holds the benefit of the Client’s insurance of the Materials on trust for the Contractor and must pay to the Contractor the proceeds of any insurance in the event of the Materials being lost, damaged or destroyed;
(c) the production of these terms and conditions by the Contractor shall be sufficient evidence of the Contractor’s rights to receive the insurance proceeds direct from the insurer without the need for any person dealing with the Contractor to make further enquiries;
(d) the Client must not sell, dispose, or otherwise part with possession of the Materials other than in the ordinary course of business and for market value. If the Client sells, disposes or parts with possession of the Materials then the Client must hold the proceeds of any such act on trust for the Contractor and must pay or deliver the proceeds to the Contractor on demand;
(e) the Client should not convert or process the Materials or intermix them with other goods but if the Client does so then the Client holds the resulting product on trust for the benefit of the Contractor and must sell, dispose of or return the resulting product to the Contractor as it so directs;
(f) unless the Materials have become fixtures the Client irrevocably authorises the Contractor to enter any premises where the Contractor believes the Materials are kept and recover possession of the Materials;
(g) the Contractor may recover possession of any Materials in transit whether or not delivery has occurred;
(h) the Client shall not charge or grant an encumbrance over the Materials nor grant nor otherwise give away any interest in the Materials while they remain the property of the Contractor;
(i) the Contractor may commence proceedings to recover the Price of the Materials sold notwithstanding that ownership of the Materials has not passed to the Client.

17. Personal Property Securities Act 2009 (“PPSA”)

17.1 In this clause financing statement, financing change statement, security agreement, and security interest has the meaning given to it by the PPSA.
17.2 Upon assenting to these terms and conditions in writing the Client acknowledges and agrees that these terms and conditions constitute a security agreement for the purposes of the PPSA and creates a security interest in all Materials and/or collateral (account) – being a monetary obligation of the Client to the Contractor for Works – that have previously been supplied and that will be supplied in the future by the Contractor to the Client.
17.3 The Client undertakes to:
(a) promptly sign any further documents and/or provide any further information (such information to be complete, accurate and up-to-date in all respects) which the Contractor may reasonably require to:
(i) register a financing statement or financing change statement in relation to a security interest on the Personal Property Securities Register;
(ii) register any other document required to be registered by the PPSA; or
(iii) correct a defect in a statement referred to in clause 17.3(a)(i) or 17.3(a)(ii);
(b) indemnify, and upon demand reimburse, the Contractor for all expenses incurred in registering a financing statement or financing change statement on the Personal Property Securities Register established by the PPSA or releasing any Materials charged thereby;
(c) not register a financing change statement in respect of a security interest without the prior written consent of the Contractor;
(d) not register, or permit to be registered, a financing statement or a financing change statement in relation to the Materials and/or collateral (account) in favour of a third party without the prior written consent of the Contractor;
(e) immediately advise the Contractor of any material change in its business practices of selling the Materials which would result in a change in the nature of proceeds derived from such sales.
17.4 The Contractor and the Client agree that sections 96, 115 and 125 of the PPSA do not apply to the security agreement created by these terms and conditions.
17.5 The Client hereby waives its rights to receive notices under sections 95, 118, 121(4), 130, 132(3)(d) and 132(4) of the PPSA.
17.6 The Client waives its rights as a grantor and/or a debtor under sections 142 and 143 of the PPSA.
17.7 Unless otherwise agreed to in writing by the Contractor, the Client waives its right to receive a verification statement in accordance with section 157 of the PPSA.
17.8 The Client shall unconditionally ratify any actions taken by the Contractor under clauses 17.3 to 17.5.
17.9 Subject to any express provisions to the contrary (including those contained in this clause 17), nothing in these terms and conditions is intended to have the effect of contracting out of any of the provisions of the PPSA.

18. Security and Charge

18.1 In consideration of the Contractor agreeing to supply the Materials, the Client charges all of its rights, title and interest (whether joint or several) in any land, realty or other assets capable of being charged, owned by the Client either now or in the future, to secure the performance by the Client of its obligations under these terms and conditions (including, but not limited to, the payment of any money).
18.2 The Client indemnifies the Contractor from and against all the Contractor’s costs and disbursements including legal costs on a solicitor and own client basis incurred in exercising the Contractor’s rights under this clause.
18.3 The Client irrevocably appoints the Contractor and each director of the Contractor as the Client’s true and lawful attorney/s to perform all necessary acts to give effect to the provisions of this clause 18 including, but not limited to, signing any document on the Client’s behalf.

19. Defects, Warranties and Returns, Competition and Consumer Act 2010 (“CCA”)

19.1 The Client must inspect all Materials on delivery (or the Works on completion) and must within ninety (90) days of delivery notify the Contractor in writing of any evident defect/damage, shortage in quantity, or failure to comply with the description or quote. The Client must notify any other alleged defect in the Materials/Works as soon as reasonably possible after any such defect becomes evident. Upon such notification the Client must allow the Contractor to inspect the Materials or to review the Works provided.
19.2 Under applicable State, Territory and Commonwealth Law (including, without limitation the CCA), certain statutory implied guarantees and warranties (including, without limitation the statutory guarantees under the CCA) may be implied into these terms and conditions (Non-Excluded Guarantees).
19.3 The Contractor acknowledges that nothing in these terms and conditions purports to modify or exclude the Non-Excluded Guarantees.
19.4 Except as expressly set out in these terms and conditions or in respect of the Non-Excluded Guarantees, the Contractor makes no warranties or other representations under these terms and conditions including but not limited to the quality or suitability of the Materials/Works. The Contractor’s liability in respect of these warranties is limited to the fullest extent permitted by law.
19.5 If the Client is a consumer within the meaning of the CCA, the Contractor’s liability is limited to the extent permitted by section 64A of Schedule 2.
19.6 If the Contractor is required to replace any Materials under this clause or the CCA, but is unable to do so, the Contractor may refund any money the Client has paid for the Materials.
19.7 If the Contractor is required to rectify, re-supply, or pay the cost of re-supplying the Works under this clause or the CCA, but is unable to do so, then the Contractor may refund any money the Client has paid for the Works but only to the extent that such refund shall take into account the value of Works and Materials which have been provided to the Client which were not defective.
19.8 If the Client is not a consumer within the meaning of the CCA, the Contractor’s liability for any defect or damage in the Materials is:
(a) limited to the value of any express warranty or warranty card provided to the Client by the Contractor at the Contractor’s sole discretion;
(b) limited to any warranty to which the Contractor is entitled, if the Contractor did not manufacture the Materials;
(c) otherwise negated absolutely.
19.9 Subject to this clause 19, returns will only be accepted provided that:
(a) the Client has complied with the provisions of clause 19.1; and
(b) the Contractor has agreed that the Materials are defective; and
(c) the Materials are returned within a reasonable time at the Client’s cost (if that cost is not significant); and
(d) the Materials are returned in as close a condition to that in which they were delivered as is possible.
19.10 Notwithstanding clauses 19.1 to 19.9 but subject to the CCA, the Contractor shall not be liable for any defect or damage which may be caused or partly caused by or arise as a result of:
(a) the Client failing to properly maintain or store any Materials;
(b) the Client using the Materials for any purpose other than that for which they were designed;
(c) the Client continuing to use any Materials after any defect became apparent or should have become apparent to a reasonably prudent operator or user;
(d) interference with the Works by the Client or any third party without the Contractor’s prior approval;
(e) the Client failing to follow any instructions or guidelines provided by the Contractor;
(f) fair wear and tear, any accident, or act of God.
19.11 The Contractor may in its absolute discretion accept non-defective Materials for return in which case the Contractor may require the Client to pay handling fees of up to twenty percent (20%) of the value of the returned Materials plus any freight costs.
19.12 Notwithstanding anything contained in this clause if the Contractor is required by a law to accept a return then the Contractor will only accept a return on the conditions imposed by that law.
19.13 Subject to clause 19.1, customised, or non-stocklist items or Materials made or ordered to the Client’s specifications are not acceptable for credit or return.

20. Intellectual Property

20.1 Where the Contractor has designed, drawn, written plans or a schedule of Works, or created any products for the Client, then the copyright in all such designs, drawings, documents, plans, schedules and products shall remain vested in the Contractor, and shall only be used by the Client at the Contractor’s discretion. Under no circumstances may such designs, drawings and documents be used without the express written approval of the Contractor.
20.2 The Client warrants that all designs, specifications or instructions given to the Contractor will not cause the Contractor to infringe any patent, registered design or trademark in the execution of the Client’s order and the Client agrees to indemnify the Contractor against any action taken by a third party against the Contractor in respect of any such infringement.
20.3 The Client agrees that the Contractor may (at no cost) use for the purposes of marketing or entry into any competition, any documents, designs, drawings, plans or products which the Contractor has created for the Client.

21. Default and Consequences of Default

21.1 Interest on overdue invoices shall accrue daily from the date when payment becomes due, until the date of payment, at a rate of two and a half percent (2.5%) per calendar month (and at the Contractor’s sole discretion such interest shall compound monthly at such a rate) after as well as before any judgment.
21.2 If the Client owes the Contractor any money the Client shall indemnify the Contractor from and against all costs and disbursements incurred by the Contractor in recovering the debt (including but not limited to internal administration fees, legal costs on a solicitor and own client basis, the Contractor’s contract default fee, and bank dishonour fees).
21.3 Further to any other rights or remedies the Contractor may have under this Contract, if a Client has made payment to the Contractor, and the transaction is subsequently reversed, the Client shall be liable for the amount of the reversed transaction, in addition to any further costs incurred by the Contractor under this clause 21 where it can be proven that such reversal is found to be illegal, fraudulent or in contravention to the Client’s obligations under this Contract.
21.4 Without prejudice to the Contractor’s other remedies at law the Contractor shall be entitled to cancel all or any part of any order of the Client which remains unfulfilled and all amounts owing to the Contractor shall, whether or not due for payment, become immediately payable if:
(a) any money payable to the Contractor becomes overdue, or in the Contractor’s opinion the Client will be unable to make a payment when it falls due;
(b) the Client has exceeded any applicable credit limit provided by the Contractor;
(c) the Client becomes insolvent or bankrupt, convenes a meeting with its creditors or proposes or enters into an arrangement with creditors, or makes an assignment for the benefit of its creditors; or
(d) a receiver, manager, liquidator (provisional or otherwise) or similar person is appointed in respect of the Client or any asset of the Client.

22. Cancellation

22.1 Without prejudice to any other remedies the Contractor may have, if at any time the Client is in breach of any obligation (including those relating to payment) under these terms and conditions the Contractor may suspend or terminate the supply of Works to the Client. The Contractor will not be liable to the Client for any loss or damage the Client suffers because the Contractor has exercised its rights under this clause.
22.2 The Contractor may cancel any contract to which these terms and conditions apply or cancel delivery of Works at any time before the Works are commenced by giving written notice to the Client. On giving such notice the Contractor shall repay to the Client any sums paid in respect of the Price, less any amounts owing by the Client to the Contractor for Works already performed. The Contractor shall not be liable for any loss or damage whatsoever arising from such cancellation.
22.3 In the event that the Client cancels the delivery of Works the Client shall be liable for any and all loss incurred (whether direct or indirect) by the Contractor as a direct result of the cancellation (including, but not limited to, any loss of profits).
22.4 Cancellation of orders for products made to the Client’s specifications, or for non-stocklist items, will definitely not be accepted once production has commenced, or an order has been placed.

23. Privacy Policy (terms of trade)

23.1 All emails, documents, images or other recorded information held or used by the Contractor is Personal Information, as defined and referred to in clause 23.3, and therefore considered Confidential Information. The Contractor acknowledges its obligation in relation to the handling, use, disclosure and processing of Personal Information pursuant to the Privacy Act 1988 (“the Act”) including the Part IIIC of the Act being Privacy Amendment (Notifiable Data Breaches) Act 2017 (NDB) and any statutory requirements, where relevant in a European Economic Area (“EEA”), under the EU Data Privacy Laws (including the General Data Protection Regulation “GDPR”) (collectively, “EU Data Privacy Laws”). The Contractor acknowledges that in the event it becomes aware of any data breaches and/or disclosure of the Client’s Personal Information, held by the Contractor that may result in serious harm to the Client, the Contractor will notify the Client in accordance with the Act and/or the GDPR. Any release of such Personal Information must be in accordance with the Act and the GDPR (where relevant) and must be approved by the Client by written consent, unless subject to an operation of law.
23.2 Notwithstanding clause 23.1, privacy limitations will extend to the Contractor in respect of Cookies where the Client utilises the Contractor’s website to make enquiries. The Contractor agrees to display reference to such Cookies and/or similar tracking technologies, such as pixels and web beacons (if applicable), such technology allows the collection of Personal Information such as the Client’s:
(a) IP address, browser, email client type and other similar details;
(b) tracking website usage and traffic; and
(c) reports are available to the Contractor when the Contractor sends an email to the Client, so the Contractor may collect and review that information (“collectively Personal Information”)
If the Client consents to the Contractor’s use of Cookies on the Contractor’s website and later wishes to withdraw that consent, the Client may manage and control the Contractor’s privacy controls via the Client’s web browser, including removing Cookies by deleting them from the browser history when exiting the site.
23.3 The Client agrees for the Contractor to obtain from a credit reporting body (CRB) a credit report containing personal credit information (e.g. name, address, D.O.B, occupation, driver’s license details, electronic contact (email, Facebook or Twitter details), medical insurance details or next of kin and other contact information (where applicable), previous credit applications, credit history) about the Client in relation to credit provided by the Contractor.
23.4 The Client agrees that the Contractor may exchange information about the Client with those credit providers and with related body corporates for the following purposes:
(a) to assess an application by the Client; and/or
(b) to notify other credit providers of a default by the Client; and/or
(c) to exchange information with other credit providers as to the status of this credit account, where the Client is in default with other credit providers; and/or
(d) to assess the creditworthiness of the Client including the Client’s repayment history in the preceding two (2) years.
23.5 The Client consents to the Contractor being given a consumer credit report to collect overdue payment on commercial credit.
23.6 The Client agrees that personal credit information provided may be used and retained by the Contractor for the following purposes (and for other agreed purposes or required by):
(a) the provision of Works; and/or
(b) analysing, verifying and/or checking the Client’s credit, payment and/or status in relation to the provision of Works; and/or
(c) processing of any payment instructions, direct debit facilities and/or credit facilities requested by the Client; and/or
(d) enabling the collection of amounts outstanding in relation to the Works.
23.7 The Contractor may give information about the Client to a CRB for the following purposes:
(a) to obtain a consumer credit report;
(b) allow the CRB to create or maintain a credit information file about the Client including credit history.
23.8 The information given to the CRB may include:
(a) Personal Information as outlined in 23.3 above;
(b) name of the credit provider and that the Contractor is a current credit provider to the Client;
(c) whether the credit provider is a licensee;
(d) type of consumer credit;
(e) details concerning the Client’s application for credit or commercial credit (e.g. date of commencement/termination of the credit account and the amount requested);
(f) advice of consumer credit defaults, overdue accounts, loan repayments or outstanding monies which are overdue by more than sixty (60) days and for which written notice for request of payment has been made and debt recovery action commenced or alternatively that the Client no longer has any overdue accounts and the Contractor has been paid or otherwise discharged and all details surrounding that discharge(e.g. dates of payments);
(g) information that, in the opinion of the Contractor, the Client has committed a serious credit infringement;
(h) advice that the amount of the Client’s overdue payment is equal to or more than one hundred and fifty dollars ($150).
23.9 The Client shall have the right to request (by e-mail) from the Contractor:
(a) a copy of the Personal Information about the Client retained by the Contractor and the right to request that the Contractor correct any incorrect Personal Information; and
(b) that the Contractor does not disclose any Personal Information about the Client for the purpose of direct marketing.
23.10 The Contractor will destroy Personal Information upon the Client’s request (by e-mail) or if it is no longer required unless it is required in order to fulfil the obligations of this Contract or is required to be maintained and/or stored in accordance with the law.
23.11 The Client can make a privacy complaint by contacting the Contractor via e-mail. The Contractor will respond to that complaint within seven (7) days of receipt and will take all reasonable steps to make a decision as to the complaint within thirty (30) days of receipt of the complaint. In the event that the Client is not satisfied with the resolution provided, the Client can make a complaint to the Information Commissioner at www.oaic.gov.au.

24. Building and Construction Industry Security of Payments Act 1999

24.1 At the Contractor’s sole discretion, if there are any disputes or claims for unpaid Works and/or Materials then the provisions of the Building and Construction Industry Security of Payments Act 1999 may apply.
24.2 Nothing in this Contract is intended to have the affect of contracting out of any applicable provisions of the Building and Construction Industry Security of Payments Act 1999 of New South Wales, except to the extent permitted by the Act where applicable.

25. Architects Act 2003 NSW and Architects Regulations 2004
25.1 Nothing in this Contract is intended to have the effect of contracting out of any applicable provisions of the Architects Act 2003 NSW or the Architects Regulations 2004, except to the extent permitted by those Acts where applicable.

26. Service of Notices

26.1 Any written notice given under this Contract shall be deemed to have been given and received:
(a) by handing the notice to the other party, in person;
(b) by leaving it at the address of the other party as stated in this Contract;
(c) by sending it by registered post to the address of the other party as stated in this Contract;
(d) if sent by facsimile transmission to the fax number of the other party as stated in this Contract (if any), on receipt of confirmation of the transmission;
(e) if sent by email to the other party’s last known email address.
26.2 Any notice that is posted shall be deemed to have been served, unless the contrary is shown, at the time when by the ordinary course of post, the notice would have been delivered.

27. Trusts

27.1 If the Client at any time upon or subsequent to entering in to the Contract is acting in the capacity of trustee of any trust (“Trust”) then whether or not the Contractor may have notice of the Trust, the Client covenants with the Contractor as follows:
(a) the Contract extends to all rights of indemnity which the Client now or subsequently may have against the Trust and the trust fund;
(b) the Client has full and complete power and authority under the Trust to enter into the Contract and the provisions of the Trust do not purport to exclude or take away the right of indemnity of the Client against the Trust or the trust fund. The Client will not release the right of indemnity or commit any breach of trust or be a party to any other action which might prejudice that right of indemnity;
(c) the Client will not without consent in writing of the Contractor (the Contractor will not unreasonably withhold consent), cause, permit, or suffer to happen any of the following events:
(i) the removal, replacement or retirement of the Client as trustee of the Trust;
(ii) any alteration to or variation of the terms of the Trust;
(iii) any advancement or distribution of capital of the Trust; or
(iv) any resettlement of the trust property.

28. General

28.1 The failure by either party to enforce any provision of these terms and conditions shall not be treated as a waiver of that provision, nor shall it affect that party’s right to subsequently enforce that provision. If any provision of these terms and conditions shall be invalid, void, illegal or unenforceable the validity, existence, legality and enforceability of the remaining provisions shall not be affected, prejudiced or impaired.
28.2 These terms and conditions and any contract to which they apply shall be governed by the laws of New South Wales, the state in which the Contractor has its principal place of business, and are subject to the jurisdiction of the Manly Local Court in New South Wales.
28.3 Subject to clause 19, the Contractor shall be under no liability whatsoever to the Client for any indirect and/or consequential loss and/or expense (including loss of profit) suffered by the Client arising out of a breach by the Contractor of these terms and conditions (alternatively the Contractor’s liability shall be limited to damages which under no circumstances shall exceed the Price of the Works).
28.4 The Contractor may licence and/or assign all or any part of its rights and/or obligations under this Contract without the Client’s consent.
28.5 The Client cannot licence or assign without the written approval of the Contractor.
28.6 The Contractor may elect to subcontract out any part of the Works but shall not be relieved from any liability or obligation under this Contract by so doing. Furthermore, the Client agrees and understands that they have no authority to give any instruction to any of the Contractor’s sub-contractors without the authority of the Contractor.
28.7 The Client agrees that the Contractor may amend their general terms and conditions for subsequent future contracts with the Client by disclosing such to the Client in writing. These changes shall be deemed to take effect from the date on which the Client accepts such changes, or otherwise at such time as the Client makes a further request for the Contractor to provide Works to the Client.
28.8 Neither party shall be liable for any default due to any act of God, war, terrorism, strike, lock-out, industrial action, fire, flood, storm or other event beyond the reasonable control of either party.
28.9 Both parties warrant that they have the power to enter into this Contract and have obtained all necessary authorisations to allow them to do so, they are not insolvent and that this Contract creates binding and valid legal obligations on them.

TERMS OF USE OF WEBSITE AND CONTENT

Please take the time to read these terms and conditions.  By using Our Website and the Services and information offered on Our Website, you are agreeing to these terms and conditions.

If you purchase products through our Website, there will be additional terms and conditions relating to the purchase.  Please make sure you agree with these terms and conditions, which you will be directed to read prior to making your purchase.

Definitions

Services means Construction and Construction Management

the Website means the website www.SynergyCG.com.au

We / Us etc means Synergy Construction Group Pty Ltd and any subsidiaries, affiliates, employees, officers, agents or assigns.

Accuracy of content

We have taken proper care and precautions to ensure that the information we provide on this Website is accurate.  However, we cannot guarantee, nor do we accept any legal liability arising from or connected to, the accuracy, reliability, currency or completeness of anything contained on this Website or on any linked site.

The information contained on this Website should not take the place of professional advice.

Use

The Website is made available for your use on your acceptance and compliance with these terms and conditions.  By using this Website, you are agreeing to these terms and conditions.

You agree that you will use this website in accordance with all applicable local, state, national and international laws, rules and regulations.

You agree that you will not use, nor will you allow or authorise any third party to use, the Website for any purpose that is unlawful, defamatory, harassing, abusive, fraudulent or obscene way or in any other inappropriate way or in a way which conflicts with the Website or the Services.

If you contribute to our forum (if any) or make any public comments on this Website which are, in our opinion, unlawful, defamatory, harassing, abusive, fraudulent or obscene or in any other way inappropriate or which conflict with the Website or the Services offered, then we may at our discretion, refuse to publish such comments and/or remove them from the Website.

We reserve the right to refuse or terminate service to anyone at any time without notice or reason.

Passwords and logins

You are responsible for maintaining the confidentiality of your passwords and login details and for all activities carried out under your password and login.

Indemnification for loss or damage

You agree to indemnify Us and hold Us harmless from and against any and all liabilities or expenses arising from or in any way related to your use of this Website or the Services or information offered on this Website, including any liability or expense arising from all claims, losses, damages (actual and consequential), suits, judgments, litigation costs and solicitors fees of every kind and nature incurred by you or any third parties through you.

Intellectual property and copyrights

We hold the copyright to the content of this Website, including all uploaded files, layout design, data, graphics, articles, file content, codes, news, tutorials, videos, reviews, forum posts and databases contained on the Website or in connection with the Services. You must not use or replicate our copyright material other than as permitted by law.  Specifically, you must not use or replicate our copyright material for commercial purposes unless expressly agreed to by Us, in which case we may require you to sign a Licence Agreement.

If you wish to use content, images or other of our intellectual property, you should submit your request to us at the following email address:

info@SynergyCG.com.au

Trademarks

The trademarks and logos contained on this Website are trademarks of Synergy Construction Group Pty Ltd. Use of these trademarks is strictly prohibited except with Our express, written consent.

Links to external websites

This Website may contain links that direct you outside of this Website.  These links are provided for your convenience and are not an express or implied indication that we endorse or approve of the linked Website, it’s contents or any associated website, product or service.  We accept no liability for loss or damage arising out of or in connection to your use of these sites.

You may link to our articles or home page.  However, you should not provide a link which suggests any association, approval or endorsement on our part in respect to your website, unless we have expressly agreed in writing.  We may withdraw our consent to you linking to our site at any time by notice to you.

Limitation of Liability

We take no responsibility for the accuracy of any of the content or statements contained on this Website or in relation to our Services.  Statements made are by way of general comment only and you should satisfy yourself as to their accuracy.  Further, all of our Services are provided without a warranty with the exception of any warranties provided by law.  We are not liable for any damages whatsoever, incurred as a result of or relating to the use of the Website or our Services.

Information Collection

Use of information you have provided us with, or that we have collected and retained relating to your use of the Website and/or our Services, is governed by our Privacy Policy.  By using this Website and the Services associated with this Website, you are agreeing to the Privacy Policy.  To view our Privacy Policy and read more about why we collect personal information from you and how we use that information, please see our Privacy Policy link.

Confidentiality

All personal information you give us will be dealt with in a confidential manner in accordance with our Privacy Policy.  However, due to circumstances outside of our control, we cannot guarantee that all aspects of your use of this Website will be confidential due to the potential ability of third parties to intercept and access such information.

Governing Law

These terms and conditions are governed by and construed in accordance with the laws of New South Wales, Australia.  Any disputes concerning this website are to be resolved by the courts having jurisdiction in New South Wales.

We retain the right to bring proceedings against you for breach of these Terms and Conditions, in your country of residence or any other appropriate country or jurisdiction.